Installation of a PVC pool
  • Layout, marking out
  • Positioning the geotextile, laying the screed, then levelling the gravel to prepare the shape of the bottom
  • Earthwork
  • Installation of the pool
   
  • Checking the levels and alignments
  • Laying the deck around the edge
  • Installing the hydraulics
  • Assembling the filtration system
  • Backfilling with gravel
  • Reinforcement work
  • Creating the concrete ring
     
Home | Introduction | Flat-bottom models | Sloped-bottom models | Telescoping covers
| Our designs | Installation | Accessories